SNUPPS, or Standardized Nuclear Unit Power Plant System, is one of a series of pressurized-water reactors built by Westinghouse.
标准化核电站系统(简称SNUPPS)是西屋电气公司建造的众多压水反应堆之一。
The novel method of the fuzzy neuron model-free coordination control is proposed for a unit power plant with uncertainties in this paper.
本文提出了具有不确定性火电单元机组的一种前馈模糊神经非模型协调控制方法。
In the neighboring hall there is the turbine - the second most important unit in a nuclear power plant.
邻近的大厅安装着汽轮机,这是核电厂里第二重要的单元设备。
An explosion blew the roof and outer walls off of the number 3 unit Monday at the Fukushima nuclear power plant in earthquake-stricken northern Japan.
日本北部遭受地震的福岛核电站星期一发生爆炸,炸毁了3号机组的外墙和屋顶。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对华能玉环电厂1 000MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
Regarding the abnormal large vibration of reheat steam pipe of unit 3 for Shandong Huangdao Power Plant, the causes were analyzed.
针对山东黄岛发电厂3号机组再热管道出现的异常大幅度振动,进行了原因分析;
This paper introduces the application and energy saving result after unit 2 of Zhangjiakou Power Plant adopted less oil ignition and low load stable combustion technology.
介绍张家口发电厂2号机组采用少油冷炉点火和低负荷稳燃技术后的使用情况和节能效果。
This paper introduces collision tests used in Huaneng Yuhuan Power Plant 1 000 MW unit axial and radial alignments of turbine HP, IP and LP casings.
详细介绍了华能玉环电厂1 000MW机组采用碰撞试验的方法进行汽轮机高、中、低压缸轴向、径向定位。
In the end, based on electricity, the calculating methods for the cost and benefit of heating and electricity are studied, which are applied to air-cooled unit of BaoTou Second Thermal Power Plant.
最后,以电量法为基础,研究了热电联产热、电产品的成本效益计算方法,并将其应用于包头二热空冷机组的成本效益分析中。
The LP casing blade of unit 3 in Tuoketuo Power Plant is broken after only three months operation.
托电3号机组低压缸叶片运行仅3个月就发生了断裂。
Based on the application of CEMS to the coal-fired generating unit of Jiaozuo Power Plant, the working principle of a CEMS based on heating type direct extraction is presented.
以烟气连续排放监测系统在焦作电厂燃煤发电机组上的应用为例,介绍了一种加热式直接抽取法烟气连续监测系统的原理,分析了系统组成及功能、系统运行及系统的维护检修。
To support environmental protection, Baoding Thermal Power Plant Unit 1 to 6, respectively, in 2007 and early 2008, closed down.
为支持环保工作,保定热电厂1至6号机组分别于2007年和2008年提前关停。
The leakage in vacuum system of steam turbine for unit no. 4 in Zhangze Power Plant decreased thermal efficiency of said unit.
漳泽发电厂4号机组汽轮机真空系统泄漏,降低了机组热效率。
Heat deviation analytical method is adopted, which is used to analyze the influences which the main operational monitored parameters have on the economic performance of the power plant unit.
采用热偏差分析方法,分析了锅炉主要运行可监控参数对机组经济性的影响。
The principle, system technological process and main equipment used in desulfurization project of flue gas circulating fluidized bed for 100 MW unit in Xiaolong Tan Power Plant are presented.
阐述了小龙潭发电厂100MW机组烟气脱硫工程的工艺原理、系统流程、主要设备等,并结合系统调试过程中发现的问题,对该工艺的运行调试进行了评述。
The upper guide bearing pads of unit 2 in Jiangsu Shahe Pumped-storage Power Plant had been burned to damage during commissioning period.
江苏沙河抽水蓄能电站2号机组在调试过程中曾出现上导瓦烧损事故。
With comprehensive comparison and analysis on the advantages of the two operation proposals were provided for the selection of condensate polishing unit in the power plant.
通过对两种方式运行情况的优缺点进行了全面分析和探讨,对直接空冷机组凝结水精处理系统的选型提出了建议。
Furthermore, Load optimizing distribution of main-pipeline unit is one of problems in the running of main-pipeline power plant.
此外,母管制机组间的负荷优化分配是母管制电厂运行中常遇到的问题之一。
The condenser throat of power plant is the connective unit between turbine and condenser.
电厂凝汽器喉部是汽轮机与凝汽器的连接部件。
This paper based on a unit at a power plant overhaul cylinder thread repair damage after the success of the case details provide a deal with issues such effective solution.
通过实例对电厂大修时常见的汽缸螺孔损坏后进行修复问题的详述,提供了一种处理该类问题行之有效的解决方法。
Dynamic characteristic of power plant thermal process is close related with operation conditions of power unit.
电厂热工过程的动态特性与整个机组的运行工况密切相关。
The existing problems and influencing factors of the reheated steam control system of No. 4 Unit in Zhangjiakou Power Plant are presented.
介绍了河北省张家口发电厂4号机组再热汽温调节系统存在的问题及其影响因素。
This paper briefly describes the siting of Qingshan Nuclear Power Plant, the first 300MW PWR unit of China.
本文简要介绍了我国第一座300MW压水堆型核电站——秦山核电厂的厂址选定情况。
This article, to the Meng Da power plant 330MW unit, develops one et of complete power station boiler heating surface dust stratification and slag-bonding monitoring system.
本文针对内蒙达旗电厂330MW机组,开发了一套完整的电站锅炉受热面结渣积灰监测系统。
Air preheater a of Unit 5 boiler in Shajiao 'a' Power Plant experienced a secondary combustion during Standby. As a result, the air preheater was damaged seriously.
沙角发电总厂A厂5号炉a空气预热器(以下简称“空预器”)在停炉期间发生二次燃烧,造成该空预器严重损坏。
Air preheater a of Unit 5 boiler in Shajiao 'a' Power Plant experienced a secondary combustion during Standby. As a result, the air preheater was damaged seriously.
沙角发电总厂A厂5号炉a空气预热器(以下简称“空预器”)在停炉期间发生二次燃烧,造成该空预器严重损坏。
应用推荐