The turbine DEH system adapts to prompt load drop, when the unit runs with transient house load to realize sliding pressure shutdown following the time required by turbine main equipment.
在汽机DEH系统适应快速降负荷的情况后,根据汽机主设备要求的时间短暂带厂用电负荷运行进行滑压停机。
The turbine DEH system adapts to prompt load drop, when the unit runs with transient house load to realize sliding pressure shutdown following the time required by turbine main equipment.
在汽机DEH系统适应快速降负荷的情况后,根据汽机主设备要求的时间短暂带厂用电负荷运行进行滑压停机。
应用推荐