• In design of homogeneous earth dam, sudden drawdown of water level is always a control condition for stability of upstream slope.

    土坝设计中,水位骤降通常上游边坡稳定计算时需控制工况

    youdao

  • This paper introduced the cause reason for freezing damage at upstream slope protection of the earth dams, as well, prevention measures were discussed, for reference.

    土坝上游护坡冻害产生原因防治对策进行了探讨,仅供参考。

    youdao

  • Since 1970s, the vibroflotation technique was introduced into China for soft foundation strengthening with better results but without application in upstream slope in sanded shell dams.

    技术70年代引入我国以来用于加固效果好,应用砂壳坝上游坝尚未工程实例。

    youdao

  • This thesis takes Wudongde hydroelectric power station upstream high rockfill cofferdam as the object to study, and carries out the research on seepage and stability of slope.

    本文乌东德水电站上游土石围堰研究对象,从渗流边坡稳定两方面展开研究

    youdao

  • The concrete crushing type sidewall technology is a new method for constructing the upstream side slope of concrete face rockfill dam.

    混凝土挤压边墙技术混凝土面板堆石坝上游施工方法

    youdao

  • The concrete crushing type sidewall technology is a new method for constructing the upstream side slope of concrete face rockfill dam.

    混凝土挤压边墙技术混凝土面板堆石坝上游施工方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定