The problem of the wall cracks in upper floor due to difference in temperature is discussed, which is built with the small concrete hollow blocks.
顶层墙体的温度裂缝问题影响了混凝土小型空心砌块建筑的应用和推广。
The approximate calculation methods to control the cracks in the top wall of brick and concrete structure due to temperature difference and the related precaution - ary measures are put forward.
提出了控制砖混结构墙顶温度裂缝的近似计算方法以及有关防治措施。
Function of the system for measuring difference in cooling water temperature and analysis of the heat work system of BF, the distributing of gas flow and the leak of cooling wall were introduced.
重点介绍了水温差在线检测系统的功能以及利用其分析高炉热制度、判断煤气流分布和检查冷却壁漏水的情况。
Function of the system for measuring difference in cooling water temperature and analysis of the heat work system of BF, the distributing of gas flow and the leak of cooling wall were introduced.
重点介绍了水温差在线检测系统的功能以及利用其分析高炉热制度、判断煤气流分布和检查冷却壁漏水的情况。
应用推荐