Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system.
而解决浑水管道泥沙淤堵问题的关键在于其临界不淤流速的确定。
Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system and corresponding technical measures.
而解决浑水管道泥沙淤堵问题的关键在于确定其临界不淤流速及与之配套的工程技术措施。
Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system and corresponding technical measures.
而解决浑水管道泥沙淤堵问题的关键在于确定其临界不淤流速及与之配套的工程技术措施。
应用推荐