Fatigue cracks initiated from various connection details are common problems in welded steel bridge structures.
各种连接细节的疲劳性能是焊接钢桥研究的热点问题之一。
According to fatigue damage accumulation theory, test load of verified fatigue test on rail across beam and welded connections with integral joint of combined steel truss bridge was gotten.
依据疲劳损伤累积理论,确定了公轨两用钢桁桥轨道横梁与整体节点连接头验证性疲劳试验的试验荷载。
The steel-structure bridge deck is three-span, and each one is welded separately with bolt connection.
三跨的人行桥的桥面为钢结构,总共三段,每段分开焊接制作,通过螺栓连接。
The domestic steel box beam for long-span suspension bridge is mostly welded structure at present, which features complex structure, a great deal of penetration welds, difficult manufacture.
目前,国内大跨径悬索桥钢箱梁大多为全焊结构,具有结构复杂、熔透焊缝多,制造难度大等特点。
The domestic steel box beam for long-span suspension bridge is mostly welded structure at present, which features complex structure, a great deal of penetration welds, difficult manufacture.
目前,国内大跨径悬索桥钢箱梁大多为全焊结构,具有结构复杂、熔透焊缝多,制造难度大等特点。
应用推荐