Prepare the work breakdown structure.
准备工作分解结构。
D lack of a clear work breakdown structure.
缺少一个清晰的工作分解结构。
A work breakdown structure (WBS) is defined.
定义工作分解结构(WBS)。
Defines and tracks project plan and work breakdown structure.
定义并追踪项目计划与工作分解结构。
A work breakdown structure (WBS) is used on every project.
工作分解结构(WBS)用于每个项目中。
It includes a Work Breakdown Structure illustrated with activity diagrams.
它包括使用活动图进行说明的工作分解结构。
Drafting a work breakdown structure (WBS) as the basis for a project schedule.
草拟以项目计划为基础的工作故障结构(WBS)。
Project Management; Network scheduling; work Breakdown Structure; Pull Plan.
项目管理;网络计划;任务结构分解;拉动计划。
Tasks at a high level such as "Build QA Environment" are OK for a work breakdown list.
“构建QA环境”等高级别任务可以采用工作划分列表。
The example "Agile Kanban" in Figure 5 is a work breakdown, and it works well within the team.
图5中“敏捷看板”的例子是一个工作的分解,它在团队内部工作良好。
Based on our prior experience with such projects, we have developed a work breakdown structure.
基于我们以前从事类似项目的经验,我们已经制订了一个工作分解结构图。
The key parts of the SPP module are work breakdown structure (WBS) and the software estimation.
其中的重点是工作分解(WBS)和软件项目估计。
In M1 we have develop a Work Breakdown Structure and Product Breakdown Structure for a project.
在M1我们开发一个工作分解结构和产品项目分解结构。
These may be within the context of a particular project, proposal or work breakdown structure element.
这些可能在一个特定项目、提议或工作分解结构元素的上下文环境中。
To understand the complexity of the requirement, you need to create its work breakdown structure (WBS).
要理解需求的复杂性,您需要创建它的工作崩溃结构(WBS)。
Tom Mochal offers some practical advice to save you time and rework on your next work breakdown structure.
TomMochal提供了5点实践性的建议,下次进行工作分解结构设计时,你可以拿来参考节省时间。
RMC also supports different presentations for processes, such as work breakdown structure or workflow presentations.
RMC还支持不同的过程表示,比如工作分解结构或工作流表示。
See also work package, control account, contract work breakdown structure, and project summary work breakdown structure.
另外请见工作细目、控制帐目、合同工作分解结构和项目概括性工作分解结构。
For example, a formal work breakdown structure, schedule network, earned value analysis, change control process and so on.
举例来说,一个正式的工作分解结构,进度网络,挣值分析,改变控制过程等。
For the third step in the creation of the capability patterns and delivery processes, a work breakdown structure (WBS) is created.
对于能力模式和交付过程的创建中的第三步,会生成一个工作分解结构(work breakdown structure,WBS)。
The work breakdown should identify and characterize all the subprojects that will build, buy, reuse, or adapt the system components.
工作分类应该确定所有的子项目的特征,这里的子项目包括将要构建、购买、重用、或者改写系统组件的子项目。
The creation of demand comes from the requirements, statement of work, and by estimating the effort by the work breakdown structure (WBS).
需求的创建来自于需要,工作状态,以及对工作分解结构(WBS)中的工作的估计。
A work breakdown structure (WBS) is the best way to understand the detailed work of a project when you have to build a schedule from scratch.
当你需要从草稿中拟定出日程表时,工作分解结构(WBS)是理解项目工作细节的最好方式。
An RMC Delivery Process provides a complete lifecycle model that has been detailed by sequencing Method Content in work breakdown structures (WBS).
一个RMC发布过程提供了一个完整的生存周期模型,该模型包括了被细化的在方法内容中的工作分解结构(WBS)。
Additional requirements for the construction of the To-Be components can be added and the result organized into a Work Breakdown Structure (WBS).
为建筑的另外需求那到-是成份能被增加而且结果进入工作崩溃结构(WBS)之内组织。
Software designers can author and publish their process as a process Web site or export it to IBM Rational Portfolio Manager as a work breakdown structure.
软件设计人员可以创造并把他们的过程作为一个过程网站发布,或者作为一个工作分解结构输出到IBMRationalPortfolioManager 。
Figure 17 shows a typical Timesheet view that displays work assignments by project, the work breakdown structure and corresponding data for each task assignment.
图17显示了一个典型的工时单视图,展示了计划好的工作分配情况、工作分解结构和每个任务分派相应的数据。
A work breakdown structure (WBS) is defined. This is a list of tasks that, if performed, will generate all of the work products needed to build the software.
定义工作分解结构(WBS)。这是一张任务列表。如果这些任务得到执行,将会产出工作产品,而这些工作产品是形成软件所必须的。
And the example of "Lean + Agile Kanban" in Figure 7 used with Figure 8 shows a combination of a feature breakdown in the upper level and a work breakdown in the lower level.
图7中“精益+敏捷看板”的例子与图8一起展示了上级功能分解和下级工作分解的结合。
You are a project manager for a new product development project that has four levels in the work breakdown structure, and has been sequenced using the arrow diagramming technique.
你是一个新产品开发项目的项目经理,这个项目的工作分解结构有四个层次,并按顺序使用箭线图技术。