Project Management; Network scheduling; work Breakdown Structure; Pull Plan.
项目管理;网络计划;任务结构分解;拉动计划。
For example, you could implement these ideas in traditional embedded systems in place of a traditional scheduler for work scheduling.
例如,可以将这些理念应用到传统的嵌入式系统当中,取代原有的调度程序来进行任务调度。
Diagnostic units need support in the areas of work scheduling, order entry, transmission and presentation of results and accounting.
诊断单位需要支持在区域内的工作日程安排,登记顺序,输送解释结果和帐目。
The system consists of server and client components number, Database server operating systems and for the entire diagnostic test scheduling of work scheduling.
本系统由服务端和多个客户端组成,服务端运行数据库系统并负责整个诊断测试调度器的调度工作。
It's amazing that the small number of scheduling policies in Linux work at all.
但是令人惊讶的是,在Linux中只是少量的调度策略在工作。
Finally, each cluster will have a single jobtracker that is responsible for scheduling work at the datanodes and a tasktracker per datanode that performs the actual work.
最后,每个集群有一个jobtracker,它负责调度datanode上的工作。每个datanode有一个tasktracker,它们执行实际工作。
Hadoop is a perfect tool to achieve this goal with its ability to work with thousands of nodes and petabytes of data and automatically handle job scheduling, partial failure, and load balancing.
Hadoop能够处理数千个节点和pb量级的数据,可以自动地处理作业调度、部分失败和负载平衡,因此它是实现这个目标的完美工具。
It can then perform GC work for the remainder of the quantum, scheduling itself back to sleep and resuming the JVM when the quantum end time approaches.
然后才能在剩余的时间内执行gc工作,在时间量临近结束时将自身调回休眠状态并恢复JVM的运行。
On the flipside, if you put the work in and set a precedent for a more flexible view of scheduling based on your results, that’s good for everybody.
相反地,如果你以工作为赌注,以自己的工作成果为据,为制定更为的灵活日程表开启先例,这对大家来说颇有益处。
This means identifying which scheduling tools work best for us, and making sure that we clearly identify and prioritize each task that we need to do each day.
这意味着我们要找出什么样的日程工具是最适合我们自己的,并且为我们每天要做的事情设定清晰的优先度。
Start with the survey’s suggestions, scheduling creative work late at night and more mundane tasks for the end of the workday, and see how that feels.
按照那个调查的建议,把需要创造力的事情放在晚上晚些时候做,把世俗些的事情放在工作结束的时候做,看看感觉怎么样。
Likewise, various "events" within the PM lifecycle require planning, scheduling, and supporting work during and after the completion of the event.
同样,PM生命周期中的各种“事件”都需要有事件过程中,以及事件完成之后的计划、进度安排和支持工作。
Like many parents, he says that scheduling time to eat dinner together daily is challenging, and usually doesn't work out.
但像很多父母一样,他说安排时间每天一起吃饭很困难,一般不现实。
Planning and scheduling the work of the assessment.
计划并安排评估工作。
Major overhauls or installations may be scheduled during plant shutdowns or over weekends, which requires scheduling of maintenance manpower to work during those periods.
大修或装置可能被安排在工厂停工或在周末,这需要维护的人力调度,在这些时期内的工作。
At present, the work related to ideal flow scheduling system and packet scheduling algorithm for error-prone wireless channel is a hot topic in the research field of wireless communication.
目前,研究适合于信道出错、通道容量可变的无线网络理想流调度系统及其数据包调度算法是无线领域研究的一个热点问题。
For day-to-day operations, I mostly work with the Eclipse environment, but the command-line version is handy for crontab (a UNIX utility for scheduling job execution).
对于日常操作而言,我多数时间都在用eclipse环境,但是命令行版本对于crontab(计划工作执行的一种UNIX工具)非常方便。
Work Management - plan, cost, budget, resources and scheduling of project and non-project work.
工作管理(Work Management)——计划、成本、预算、资源、项目时间安排以及非项目的工作。
Construction Dept. : be responsible for scheduling of construction site and organization of production, etc. In charge of the centralized management and coordination work of Survey Team.
施工部:负责施工现场的调度及生产组织等。负责测量队的归口管理及协调工作。
This allows the "work" of scheduling to be part of the applications "larger" transaction.
这使得“工作”的时间安排,申请成为“较大部分”交易。
When job-sharing arrangements don't work out, it is often because the situation was constructed around scheduling or the job share was put together in haste because someone was going to leave.
如果工作共担这种安排无效,往往是因为只顾到时间的配合而忽视了其他,或者是因为某个雇员准备离职,公司匆忙把别的雇员凑在一块工作而导致的。
The simulation strategy that this procedure adopts is the event scheduling. Therefore, the main work focuses on dealing with the event table and processing the corresponding subprograms.
本程序采用的仿真策略是事件调度法,故主要的工作就是围绕着事件表进行并处理相应的子程序。
Planning and scheduling are done before execution of the work.
规划和日程安排之前完成执行工作。
The work in this paper provides the foundation for further research on mixed real-time transaction scheduling and concurrency control, and processing mixed transactions in actual application systems.
本文的研究成果为进一步探讨混合实时事务的调度与并发控制,以及实际应用中的混合事务处理提供了良好的基础。
A scheduling model, with the objective of minimizing the average WIP (work in Process) level, is built based on the fluid network model of semiconductor manufacturing systems.
在半导体制造系统流体网络模型的基础上,建立了以减小平均在制品水平为目标的可分解的优化调度模型。
Import of the optimization theory in the field of job scheduling in workshop, improving the performance of algorithm, and making the algorithm work perfectly are important tasks.
将优化方法的理论研究引入到车间生产调度领域中,改进算法性能、拓宽算法应用领域、完善算法体系,是一个同时具有理论意义和应用价值的课题。
Therefore, to improve the management and scheduling abilities of irregular flight has become one of most important work emphases of airlines' operations control management.
因此,提高非正常航班的调度能力已经成为航空公司运行控制管理中的主要工作重点。
The aim of this work is to propose an effective method for the solution of the cyclic scheduling problem of boiler system with decaying performance.
针对性能随时间衰减的锅炉蒸汽系统的循环调度问题进行了研究。
The aim of this work is to propose an effective method for the solution of the cyclic scheduling problem of boiler system with decaying performance.
针对性能随时间衰减的锅炉蒸汽系统的循环调度问题进行了研究。
应用推荐