After the connections are made, verify the system is working properly by turning the bias voltage on and taking a current measurement with no ion beam current.
完成电路连接之后,接通偏置电压,在没有离子束电流的情况下进行电流测量,以验证系统能够正常工作。
After the connections are made, verify the system is working properly by turning the bias voltage on and taking a current measurement with no ion beam current.
完成电路连接之后,接通偏置电压,在没有离子束电流的情况下进行电流测量,以验证系统能够正常工作。
应用推荐