In the workshop and post production, tools, equipment and materials, etc. the workpiece location must be standardized to meet the standard requirements, the implementation of on-site management.
在企业车间和生产岗位,工具、设备、材料、工件等的位置要规范,要符合标准要求,实行现场定置管理。
Later on, the on-site concrete durability test of the trestlework in the workshop building is taken as one example to analyze the concrete cover and the dept of its carbonization.
开展了某工业厂房栈桥柱的耐久性现场检测工作,对实测的混凝土保护层厚度和碳化深度进行了分析;
Later on, the on-site concrete durability test of the trestlework in the workshop building is taken as one example to analyze the concrete cover and the dept of its carbonization.
开展了某工业厂房栈桥柱的耐久性现场检测工作,对实测的混凝土保护层厚度和碳化深度进行了分析;
应用推荐