整个过程开始于第一级MPS (MasterProductionSchedule,主生产计划).这是要用于最终库存的已知需求、预想和产品的综合。
The process starts at the top level with a Master Production Schedule (MPS). This is an amalgam of known demand, forecasts and product to be made for finished stock.
整个过程开始于第一级MPS (MasterProductionSchedule,主生产计划).这是要用于最终库存的已知需求、预想和产品的综合。
The process starts at the top level with a Master Production Schedule (MPS). This is an amalgam of known demand, forecasts and product to be made for finished stock.
应用推荐