Along the cable trench and pipe bracket installation.
沿电缆沟及管道支架安装等。
This paper studies the monitor system for cable trench based on ARM7.
本论文主要研究了一种基于ARM7的电力电缆沟道监测系统。
Outdoor cable trench are reinforced concrete trench with reinforced concrete cover plate.
室外电缆沟由钢筋混凝土砌成,上面加钢筋混凝土盖板。
The excavation size is not enough: Cable trench bottom width should be increased as per construction needs.
开挖尺寸不足:电缆沟底部的开挖宽度,应根据施工需要增加工作面宽度。
Slope is not straight and base is uneven: strengthen inspection, repair cable trench, and then accept seriously.
电缆沟边坡不直不平、基底不平:应加强检查,随挖随修,并要认真验收。
Electric power industry: centralized control room, communication center, Cable trench, Wind power generator room.
电力行业:集中控制室、通信中心机房、电缆沟(夹层、隧道)、风力发电机舱等。
For laying indoors, in tunnel or cable trench, unable to bear external mechanical forces, Singlecore cable in magnetic duct is not permissible.
室内、隧道、电缆沟等场所,不能承受机械外力,单芯电缆不允许敷设在磁性管道中。
For laying indoors, in tunnels or cable trench, unable to bear external mechanical forces. Singlecore cable in magnetic duct is not permissible.
室内、隧道及电缆沟等场所,不能承受机械外力。单芯电缆不允许敷设在磁性管道中。
For laying indoors , intunnel or cable trench, unable to bear external mechan-icalforces. Single-core cable in magnetic duct is not permissible.
室内、隧道及电缆沟等场所,不能承受机械外力。单芯电缆不允许敷设在磁性管道中。
Under the cabling of urban network and demanding of city landscape, the resources of cable trench have a direct impact on the routes of network.
随着城市配网供电电缆化和城市景观要求,电缆通道资源对配电网线路走向有着直接影响。
Ultra excavation: cable trench excavation shall not exceed the bottom elevation. If ultra-dig in some places, obtain the consent of design units.
沟底超挖:开挖矿用电缆沟不得超过沟底标高,如个别地方超挖时,其处理方法应取得设计单位的同意。
For laying indoors , in tunnel, cable trench, or direct in ground, able to bear external mechanicalforces, but unable to bear large pulling force .
室内、隧道、电缆沟内,或埋地敷设等,能承受一定机械外力,但不能承受大的拉力。
For laying in doors, in tunnels, in cable trench or direct in ground, able to bear external mechanical forces, but unable to bear large pulling force.
室内、隧道、电缆沟内或埋地等能承受机械外力的场所,但不能承受大的拉力。
When C581 South Line temporary road through the warehouse of other contractor, dig down and cover with wooden poles until all cable trench is excavated to the final parts.
C581南线开挖到临时道路,通过其它承包商仓库的时候先不开挖断,等电缆沟开挖到最后的时候再回头开挖这部分,开挖后并在这些地段铺上木方。
WHEREAS party A have, with the Owner, concluded the general contract of engineering construction which is inclusive of cable trench project needed professional constructor to complete;
鉴于甲方与建设单位签订了工程建设总包合同,其中包括电缆沟施工项目需要专业施工分包人完成;
WHEREAS party A have, with the Owner, concluded the general contract of engineering construction which is inclusive of cable trench project needed professional constructor to complete;
鉴于甲方与建设单位签订了工程建设总包合同,其中包括电缆沟施工项目需要专业施工分包人完成;
应用推荐