• DX pile is a new type of squeezed cast-in-situ pile with multi-branch.

    dx近年来新兴种多节挤扩灌注桩。

    youdao

  • Foundation pit; Prestressed anchor bar, Bored cast-in-situ pile; Construction method.

    基坑预应力锚杆钻孔灌注桩;施工工法。

    youdao

  • Characterized by difficult quality control, bored cast-in-situ pile has been widely used in engineering.

    钻孔灌注桩广泛运用于工程建设中,质量控制难度较大。

    youdao

  • The application of post-grouting technique for cast-in-situ pile could not only ensure the construction quality, but also raise the bearing capacity of each pile.

    采用灌注桩后注浆技术既可确保桩基施工质量能提高承载力,极大地发挥桩基承载潜力。

    youdao

  • Through static loading contrast tests, it is found that the bearing capacity of ram-enlarged pile is higher than that of pipe-sinking cast-in-situ pile when both are tested under the same conditions.

    通过静压对比试验,得出条件基本相同时承载力大于灌注桩

    youdao

  • Thin-wall Pipe Pile Using Cast-in-situ Concrete (named PCC) technology and the application in soil improvement of Shanghai Beihuan express way are introduced.

    本文介绍了现浇混凝土薄壁管桩技术及其上海环高速公路软基加固应用

    youdao

  • The Inspection of concrete strength of cast in situ piles by Ultrasonic is to identify concrete strength at the same time to test uniformity and integrality of pile body.

    超声检测灌注桩混凝土强度超声检测混凝土匀质性完整性同时确定身混凝土的强度。

    youdao

  • The construction measures and quality management of cast in-situ piling pile and the problems to be fully noted in construction procedures were discussed.

    本文就钻孔灌注桩施工措施质量管理施工环节充分重视问题进行了探讨。

    youdao

  • It introduces the problems during construction of the cast in situ concrete pile embedded in rocks for sand loading berth of Fuzhou Port bulk cargo (river sand) wharf and the countermeasures.

    文章介绍福州散货(河砂)码头工程泊位灌注桩施工中的难题处理对策。

    youdao

  • This paper discusses the common quality problems and preventive measures during the construction of cast-in-situ bored pile construction in detail.

    本文浅析钻孔灌注桩施工过程常见施工质量问题预防措施进行详细的探讨

    youdao

  • The three-dimensional effects of pile head and applicability of plane-section assumption are main problems in low strain dynamic tests on cast-in-situ concrete thin-wall pipe piles.

    浇薄壁管桩应变检测时,存在桩头效应以及平截面假定适应性问题

    youdao

  • The three-dimensional effects of pile head and applicability of plane-section assumption are main problems in low strain dynamic tests on cast-in-situ concrete thin-wall pipe piles.

    浇薄壁管桩应变检测时,存在桩头效应以及平截面假定适应性问题

    youdao