• The viaduct No. II of Shikongshan in ZhangzhouLongyan expressway is located at a high slope with a complicated engineering geological condition.

    福建漳州龙岩高速公路龙岩段石崆山II高架桥经过工程地质条件复杂的岩质高边坡地段。

    youdao

  • The geological condition is quite complicated in mining engineering belong to Jinchuan Corporation, and out of control of blasting may cause severe consequence.

    金川公司所属矿山工程地质条件十分复杂,爆破失控带来严重后果。

    youdao

  • The geological condition is quite complicated in mining engineering belong to Jinchuan Corporation, and out of control of blasting may cause severe consequence.

    金川公司所属矿山工程地质条件十分复杂,爆破失控带来严重后果。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定