• Based on these problems, this paper expounds the construction stage of cost control method.

    针对这些问题阐述施工阶段成本控制方法。

    youdao

  • So the owner must pay attention to this, to control cost in construction stage consciously.

    工程结算支付是承包工程合同管理核心

    youdao

  • In this paper the application of supervision risk analysis in construction stage is analyzed.

    监理风险分析施工阶段运用作了介绍

    youdao

  • Third, construction stage is the essential for project cost management, needed to plan carefully.

    第三施工阶段整个工程造价管理根本需要精打细算

    youdao

  • Difficult point of organizing construction project and controlling construction stage are discussed.

    论述了工程组织难点,工程各项目实施阶段控制

    youdao

  • Not only the computing speed is fulfilled but also the goal of construction stage analysis is achieved.

    这一方法不但好地满足计算速度的要求,而且实现了考虑施工阶段边坡分析目标

    youdao

  • This paper describes settlement observation technology design in the sewage treatment works construction stage.

    本文阐述了污水处理厂施工阶段沉降观测主要技术设计

    youdao

  • In special construction stage, 24 hours continuous work will be executed and three-shift work system to be carried out.

    特殊施工阶段实施24小时连续作业,工人工作实行三班

    youdao

  • Spatial finite element models corresponding to each construction stage were established and the analysis was completed.

    每一个施工阶段建立了相应空间有限元模型,完成分析计算。

    youdao

  • Not only the requirement of the computing speed is met but also the slope analysis of the construction stage is achieved.

    这一方法不但好地满足了计算速度要求而且也实现了考虑施工阶段边坡分析的目标。

    youdao

  • The drawings illustrate the plan layout used in the current construction stage. The site layout will be updated with changes.

    附图当前施工阶段平面布置图现场布置变动时会加以更新。

    youdao

  • Three dimension finite element method is used to calculate the stress state of the cantilever during each construction stage.

    因此桥悬臂施工过程进行有限元计算,分析了各个施工阶段应力状态

    youdao

  • According to the construction stage management countermeasure system is discussed, the construction site management strategy.

    本文结合施工阶段管理对策系统论述施工现场管理策略方法

    youdao

  • The design was taken an asphalt concrete impervious layer alternative as winter construction and pressing construction stage.

    考虑冬季施工、工期紧等因素,设计采用沥青混凝土防渗方案

    youdao

  • Therefore, the cable tension and shape have to be calculated for each construction stage before analyzing its dynamic behaviour.

    因此悬索桥作施工全过程动力特性分析之前必须首先计算状态的缆轴力几何形状

    youdao

  • And to the construction stage, with detailed description of the geological information, risk control to meet the requirements of it.

    到了施工阶段地质资料详细阐述,满足风险控制要求

    youdao

  • The conclusion is that under specific condition, it is beneficial to use remote sensing technology in the railway construction stage.

    最后归纳出几点认识,提出在特定条件下施工阶段有针对性应用遥感技术有益

    youdao

  • This article introduces the control on project management and construction stage, along with procedure control and performing effect.

    本文通过工程质量工期控制介绍,阐述了工程建设的过程控制和实施效果

    youdao

  • The paper applies the mixed analysis to calculate the geometric nonlinear stability of space composite structures at construction stage.

    本文采用混合分析法进行空间组合结构施工阶段几何非线性稳定计算

    youdao

  • Design run through the project during the whole construction stage. Joining and strengthening design work becomes the base of controlling project cost.

    设计工作贯穿工程建设始终参与加强设计工作管理是水电工程造价控制基础

    youdao

  • By means of the monitoring and detailed analysis for each construction stage, feedback controlling design is realized and the construction is controlled.

    通过施工阶段监测分析反馈调整指导施工。

    youdao

  • The construction stage includes construction, processing the floors and walls of the cellar, customizing shelves and doors and installing most of the equipment.

    进行阶段包括开始进场施工酒窖地面墙体处理、层订做、门体订做、安装设备、调试设备;

    youdao

  • The length, rigidity and weight of a launching nose have significant influences on the internal forces of incrementally-launched main girder at construction stage.

    长度刚度重量顶推施工阶段对顶推主梁的内力有着重要影响,其合理配置是全桥顺利顶推的关键。

    youdao

  • The paper presents the construction methods and corresponding machinery matching schemes adopted in each construction stage of exit portion of Yuanliangshan tunnel.

    介绍梁山隧道出口各个施工阶段施工方案相应机械设备配置。

    youdao

  • In the construction stage, they ought to keep contrasting the actual construction period and cost with the budgeted to find out the causes of interference incidents.

    施工阶段不断地将实际工期成本计划工期或成本进行对比找出干扰事件发生原因

    youdao

  • The Russian involvement in the programme has played an important role in reviving the Type 093 project, which finally made to the construction stage in the late 1990s.

    俄国投入计划使093计划复活方面扮演重要角色,在1990年后期最后安排建造阶段

    youdao

  • Contact and Organize Class Surveyors for on-site inspection according to different construction stage, follow the Inspection Reports and keep contact with the Surveyors.

    按照生产建造计划的阶段组织联系船级社检验人员到场检验, 并就检验报告进行跟进

    youdao

  • On the basis of conception of zero moment, we can deduce the computational formula of the tension of cable in the different construction stage of the steel tube arch ribs.

    斜拉扣挂施工索力计算复杂,根据弯矩法”概念推导出节段吊装施工阶段索索力计算公式

    youdao

  • On the basis of conception of zero moment, we can deduce the computational formula of the tension of cable in the different construction stage of the steel tube arch ribs.

    斜拉扣挂施工索力计算复杂,根据弯矩法”概念推导出节段吊装施工阶段索索力计算公式

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定