The project construction time limit is cut short to over six months, near 100 million Yuan fund is saved and good social and economic benefit is obtained according to this optimization design.
通过此次优化设计,缩短了工程建设工期半年多,节省了近一亿元资金,取得了良好的社会和经济效益。
Those who do not make the corrections within the time limit, shall be ordered to stop construction, and can be imposed with penalty simultaneously.
逾期不改正的,责令停止施工,可以并处罚款。
At the same time, it also gives the contract and limit the rights and obligations of the parties to ensure the smooth progress of construction activities, quality and quantity objectives.
同时,它也赋予和限制了合同双方当事人的权利和义务,确保建筑活动顺利进行,保质保量的完成目标。
There are, at present, three difficulties in western countrysides, such as short of funds, great difficulty in construction and long time limit for a project.
阐述了目前西部农村建桥的三大困难:建桥资金缺、施工难度大、建设工期长;
Advanced construction methods are propitious to improve quality and security of construction, shorten the time limit for a project, lower the cost of construction.
先进的施工方法有利于提高结构的施工质量和安全性,并可有效的缩短工期和降低施工成本。
The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
The construction measure can ensure construction quality, short the time limit for a project, decrease the cost of construction and insure construction safety.
这种施工方法保证了施工质量,缩短了施工工期,降低了施工成本,做到了施工安全。
Through aimed construction management the design can meet the requirements and the limit time is shortened, which reduce the construction cost and got good economic benefit.
并通过有针对性地组织施工,使其既能满足设计要求,又能缩短工期、降低施工成本,取得良好的经济效益。
The paper detailed discusses the cause, meaning, controlling program, the dealing principle of time limit for a project and cost of change in the work, and discussing construction scheme optimum.
本文就工程变更的原因、意义、控制程序、变更工期和价格的处理原则、施工方案的优化进行了较为详尽的论述。
The research is expected to present a valid risk-management method on the time limit for a construction project.
论文的研究,期望对建筑工程项目的工期风险管理提供一种有效的方法。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
Supply chain management and e-business are efficient ways for construction enterprises to reduce cost of, shorten time limit for and improve quality of engineering projects.
供应链管理和电子商务是建筑企业节约成本、缩短工期、提高质量的有效方法。
Jinan Viaduct is along a river, limited by the location circumstance, the routine construction method can't up to the investor's require on the cost and the time limit for the project.
济南顺河高架桥由于受地埋位置的局限,按常规施工方案难以满足业主在工期、成本等方面的要求。
The bridge rotation construction craft is the efficient method especially in the gorge, cliff, or arduous landform for its simple erection equipment, short time limit, safe construction.
桥梁转体施工工艺是在深山峡谷、悬崖陡壁、地形险峻的桥位上架设桥梁的有效方法。
In order to increase the level of project construction, this paper proposed the strategy of intensifying the time limit control and cost control.
深化项目法施工,加强工期控制和进度控制,实现企业效益的最大化。
There are project summary, compilation foundations, construction plan, hoisting management, safety measures, project time limit and emergency plan etc.
其中包括工程概况、编制依据、施工方案、吊装管理、安全措施、计划工期和应急预案等。
In the construction of deep foundation, the dewatering problem is often related. The choice of dewatering plan influence the quality, limit time and cost of engineering.
在深基础施工中,往往涉及到降水的问题,降水方案的选择成功与否,对工程质量、工期以及工程造价等有很大影响。
'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
Piles are constructed in Fresh Green season. In order to keep the smooth construction of piles, responding measures are made according to climate to guarantee the quality and time limit of works.
本桩基施工正值清明季节,为使压桩工程能顺利施工,根据气候特点确定相应的措施,以保证工程的质量及工期。
According to the longest time limit of state-owned construction land, offer transferring time limit of collective construction land use right.
参照国有土地出让的最高年限来确定集体建设用地使用权流转期限。
Based on the real-time monitoring, structure analysis and current code, the limit values of those construction parameters are discussed.
根据实际工程的实时监测结果和结构受力分析,结合现行国家规范,分别给出了上述参数的控制参考限值。
According to construction conditions, an economical and reliable closure project is formulated. The time limit for the project is greatly shortened.
根据现有的施工条件,确定了拱肋的合龙方案,既经济可靠又缩短了工期。
Three controls are usually stressed in the course of construction project enforcement: quality control, time limit control and cost control, among them cost control is a more important link.
工程项目实施过程中通常强调三大控制:质量控制,工期控制,成本控制。其中成本控制是项目建设过程中的一个比较重要的环节。
In terms of technology, blended cement, curing time, equipment, finished products and other aspects the construction method utilizing high liquid plastic limit clay in road bed filling is elaborated.
通过广西岑梧高速公路二标段路基填筑的施工实践,阐述了采用含砂高液限黏土填筑路基的施工工艺方法。
In terms of technology, blended cement, curing time, equipment, finished products and other aspects the construction method utilizing high liquid plastic limit clay in road bed filling is elaborated.
通过广西岑梧高速公路二标段路基填筑的施工实践,阐述了采用含砂高液限黏土填筑路基的施工工艺方法。
应用推荐