• The influence of concrete creep on bridge structure under the construction and operation stage for prestressed concrete continuous rigid frame bridge and cable-stayed bridge is also analyzed.

    本文针对预应力混凝土连续刚构桥斜拉桥分析计算了施工运营阶段,混凝士徐变桥梁结构影响

    youdao

  • This continuous rigid-frame bridge construction of complex structure, and environmental factors, increases the difficulty of construction.

    连续刚构桥构造复杂,且受施工环境因素制约增加该桥施工难度

    youdao

  • The prestressed continuous rigid frame bridge due to the force and deformation of the structure is very complicated.

    由于预应力连续刚构桥结构受力变形情况十分复杂

    youdao

  • However, curved continuous rigid-frame bridge combines the forcing bearing characteristics between curved girder bridge and rigid-frame bridge, which makes the structure analysis complicated.

    连续刚构桥结合了弯梁桥刚构桥的受力特点使结构分析变得复杂。

    youdao

  • However, curved continuous rigid-frame bridge combines the forcing bearing characteristics between curved girder bridge and rigid-frame bridge, which makes the structure analysis complicated.

    连续刚构桥结合了弯梁桥刚构桥的受力特点使结构分析变得复杂。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定