In this paper, a DP with successive approximation method is designed for solving the hydropower unit commitment problem.
文章设计了一种逐次逼近动态规划法,可用于求解水电机组的组合问题。
In this paper, a DP with successive approximation method is designed for solving the hydropower unit commitment problem.
文章设计了一种逐次逼近动态规划法,可用于求解水电机组的组合问题。
应用推荐