Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.
进行新产品BOM(物料清单)表的建立与维护,根据工程变更或相关部门要求进行更新。
The BOM is the ligament that contacts the engineering design and production control.
BOM是联系工程设计和生产管理的纽带。
Creation of 2D/3D drawings, BOM and other design related documents, communicate with FTE German engineering centers to facilitate detailed design and drawing creation.
建立二维/三维图纸,产品零件清单及其它与设计相关的文件,与FTE德国总部的工程师中心进行详细的设计和图纸创建方面的沟通。
Creation of 2D/3D drawings, BOM and other design related documents, communicate with FTE German engineering centers to facilitate detailed design and drawing creation.
建立二维/三维图纸,产品零件清单及其它与设计相关的文件,与FTE德国总部的工程师中心进行详细的设计和图纸创建方面的沟通。
应用推荐