Numbers are thrown out but they're guesses based on expected load.
提出了一些(性能)指数,但这些指数是基于预期负载提出的。
Research has verified that the load, which is thrown-off on faults, is directly proportional to the switching time of reserve power source automatic connection devices.
经研究发现,故障时甩掉的供电负荷与该装置投入的时间成正比。
Research has verified that the load, which is thrown-off on faults, is directly proportional to the switching time of reserve power source automatic connection devices.
经研究发现,故障时甩掉的供电负荷与该装置投入的时间成正比。
应用推荐