• In the closed circulation system of ash-sluicing water of coal-fired power plant, the scaling of the hydraulic ash transport pipes and the backwater pipes is the main problem that need to be solved.

    燃煤电厂闭路循环系统水力回水管结垢所需解决主要问题

    youdao

  • The subsistent main problems in the double material electricity and hydraulic coexisting DEH system of Zhanjiang power plant 300MW Units are described.

    主要介绍工质并存DEH系统湛江发电厂300MW机组运行中存在主要问题

    youdao

  • The PWR core thermal-hydraulic design, including the design objective, criteria and main design parameters, specifically that for the Qin-Shan Nuclear Power Plant is described.

    本文介绍压水堆堆热工-水力设计其中包括了设计任务准则主要设计参数,并对秦山核电厂的热工和水力设计作了较详细的描述。

    youdao

  • The PWR core thermal-hydraulic design, including the design objective, criteria and main design parameters, specifically that for the Qin-Shan Nuclear Power Plant is described.

    本文介绍压水堆堆热工-水力设计其中包括了设计任务准则主要设计参数,并对秦山核电厂的热工和水力设计作了较详细的描述。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定