Using a variety of methods and measures to control the programs to ensure that the project carried out by the master plan and project operation can be realized on schedule.
同时采取了及时有效的纠偏措施,运用了多种方法和措施控制了进度,确保了该项目按总体计划进行并按期实现项目投产。
Using a variety of methods and measures to control the programs to ensure that the project carried out by the master plan and project operation can be realized on schedule.
同时采取了及时有效的纠偏措施,运用了多种方法和措施控制了进度,确保了该项目按总体计划进行并按期实现项目投产。