• ABSTRACT: the document system of AP1000 commissioning and operating is very complicated. But the document system is one of the most important parts in the nuclear power plant project management.

    摘要AP1000调试运行文件系统复杂,其文件管理整个电厂管理体系中的重要组成部分

    youdao

  • They had called this project “The Peaceful Atom” and so was the called the reactor of the first nuclear power plant.

    这项建设工程称为和平利用原子能”,因此就有第一核电站反应堆

    youdao

  • The four-country replacement project has strong Latvian support, but Poland is lukewarm and Estonia is considering a small nuclear-power plant of its own if the joint one falls through.

    拉脱维亚强烈支持其四替换项目(即Visaginas新核电厂,以替换原先的Ignalina),波兰态度冷淡爱沙尼亚正在考虑如果合建的核电厂失败,它将自行建造小型核电站。

    youdao

  • Although supplies of uranium fuel were known to he limited and might become exhausted in half a century, the nuclear power plant has for a long time been a favorite project.

    尽管大家知道燃料供应有限的,而且可能半个世纪耗尽原子能发电站多年来却一直特别受人喜爱的项目。

    youdao

  • The second phase extension projects of Qin Shan as well as Qin Shan nuclear power plant which is called Fang Jia Shan nuclear power project, have begun to construct.

    秦山扩建项目和秦山核电厂扩建项目方家山核电工程也已动工建设

    youdao

  • The model selected for this "Generation 2.5" nuclear power plant is based on the one currently being installed at Ling Ao 2 extension project, under a contract signed in May 2005.

    此次核电厂选型于2005年5签订合同,是目前岭澳2次扩建工程安装基础之上的。

    youdao

  • The earth and rock excavation of the plant area of the 3rd heavy water reactor project of Qinshan nuclear power plant was of two hill-bodies linked up with Qinshan hill and Huaxiang Co.

    秦山三期重水工程厂区土石方开挖秦山相连山体,湘公司承担该项工程任务。

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值燃料管理方案

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值燃料管理方案

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定