As well as saving time, this process limits the risk of defects resulting from poor workmanship on site and also significantly reduces the disruption from operations on site.
这个过程不但节约时间,而且降低了现场工程质量低劣造成的缺陷,也显著降低了现场作业会突发的中断事故。
The requirements and limits will depend on the nature of the operations carried out.
要求和限度,将根据操作的性质而定。
The requirements and limits will depend on the nature of the operations carried out.
要求和限度,将根据操作的性质而定。
应用推荐