A model was developed in this study to estimate overall highway construction cost.
本研究建立了高速公路建设全部费用估计评估模型。
This paper adopts the least square method to estimate the construction cost of the transmission-line.
采用最小二乘法对输电线路铺设成本进行了拟合估算。
This paper adopts the least square method to estimate the construction cost of the transmission-line.
采用最小二乘法对输电线路铺设成本进行了拟合估算。
应用推荐