Equipment department 2nd is a production department, responsible for equipment installation construction of engineering projects.
设备工程二部是其一个生产部门,负责设备安装类工程项目施工。
And then strengthening the management of road construction projects engineering change control strategy is proposed.
继而提出加强公路建设项目工程变更管理的控制策略。
It was in charge of water conservancy projects and the key civil engineering construction.
它主管水利工程和重要的工程建设。
It was in charge of water conservancy projects and the key civil engineering construction.
它主管水利工程和重要的工程建设。
应用推荐