testing is an iterative process .
测试是一个迭代的过程。
Migration is an iterative process.
移植是一个迭代过程。
使用迭代方法。
Adopt new tools in an iterative manner.
在迭代方式中采用新工具。
Instead, the process is much more iterative.
电影拍摄的过程是更加迭代性的。
Estimates in iterative software development.
迭代软件开发中的评估。
Figure 4: Team 1 Self Check iterative detail
图4:团队1 的SelfCheck迭代细节
Figure 6: Team 2 Self Check iterative detail.
图6:团队2的SelfCheck迭代细节。
There are many variations of the iterative method.
迭代方法有多个变体。
Waterfall requirements, iterative solution development
瀑布式需求,迭代式解决方案开发
Figure 3: The iterative model used in our case project.
图3:案例项目中使用的迭代模式。
This is the iterative, use case driven approach at work.
这就是迭代的用例驱动方法。
Figure 1: Expected risk profile for an iterative project.
图1:迭代的项目中预期风险的概况。
Step 4: Adopt an iterative and risk-driven management process.
步骤4:采用迭代式的和风险驱动的管理过程。
Set the stage for the iterative software development lifecycle.
设置迭代软件开发生命周期的阶段。
Adopt iterative development practices that reduce project risk.
采取些减少项目风险的反复开发实践。
Iterative testing is never being satisfied with the right answer.
迭代测试从来都没有满意的正确答案。
With this methodology, iterative development is also possible.
使用此方法,还可以实现交互式开发。
An iterative approach increases the need for working closely as a team.
一个迭代的方法增加了作为一个团队紧密工作的需要。
As you can see in Figure 4, the process is iterative by definition.
如图4中所示,此流程实际上具有迭代性质。
Quality improvement, like software development, is an iterative process.
质量改进,如软件开发,是一个迭代的过程。
Thus it is very important and necessary to study iterative methods.
因此迭代法的研究是非常重要和必要的。
Figure 3-1: an iterative project from the project manager's perspective.
图3 - 1:从项目管理人员的观点考虑的迭代项目。
Change solutions rapidly and support an iterative lean six sigma approach.
快速改变解决方案,支持一个迭代、精益六西格玛方法。
Figure 9: Project planning for iterative, incremental software development.
图9:针对迭代、增量软件开发的项目计划。
With the iterative approach, it is hard to hide the truth for very long.
那么重要。利用迭代的方法,很难将事实隐藏很久。
This will be an iterative process throughout the lifetime of the application.
这是应用程序声明周期中一个迭代过程。
Graph shows project profile for iterative vs. waterfall development progress.
此图展示了迭代与瀑布开发过程的项目概要文件。
It is very important to understand that this procedure is an iterative process.
这是一个反复进行的过程,理解这一点非常重要。
What does it mean for a project to work in an iterative and incremental manner?
插图对于一个项目来说,以迭代和增量的方式进行运作意味着什么?
应用推荐