Tip: Make sure the inbound work does not pile up.
提示:确保到达的工作不会堆积起来。
Moreover, the tip resistance of pile groups is better used than the single pile.
并且,板下单桩及群桩的桩端阻力均能较充分的发挥出来。
The seismic load is input at the tip of the pile.
地震波的输入采用桩尖处输入。
The seismic load is input at the tip of the pile.
地震波的输入采用桩尖处输入。
应用推荐