MOM should assign Production ME to join in NPI team before pilot run at least.
制造部经理应该至少在试生产前分配制造部制造工程师加入新产品导入团队。
Before our mass production, we must run a pilot scheme.
在我们大规模生产之前,我们必须运作一个试验性的计划。
Provide technical support to manufacturing during pilot run and production start-up.
为产品生产试运行期间和生产启动时提供技术支持。
Provide technical support to manufacturing during pilot run and production start-up.
为产品生产试运行期间和生产启动时提供技术支持。
应用推荐