Production planning and control.
生产规划和控制。
First would be to do enough to help in production planning.
首先应做足工作的就是在生产计划上的帮助。
Knowledge of production planning and ERP system is preferred.
精通生产规划和ERP系统是首选。
Implement production planning and arrange the workers daily job.
执行生产计划,安排工人日常工作。
Research on the aggregate production planning with penalty factor.
研究了资源受限的集约生产计划问题。
The production planning management is the core of enterprise management.
生产计划管理是企业管理的核心。
The lot sizing production planning in supply chain management is studied.
研究了供应链环境下的批量生产计划问题。
In charge of machining workshop materials planning and production planning.
负责生产物料计划,下采购申请单和每天跟踪紧急物料交期。
The presented solution has well applied to practical ERW production planning.
求解方法在钢管实际生产计划编制中得到了良好的应用。
Production planning and scheduling, Work Order management, Coordinate delivery.
生产计划安排,工单管理,协调交货。
Production Planning is the core and principle function of Enterprise management.
生产计划是企业经营管理的核心和首要职能。
Production Planning is the important constituent of the enterprise operation plan.
生产计划是企业生产经营计划的重要组成部分。
This has brought more indefinite factors to make and take the Production Planning.
这给生产计划的制定和完成带来了更多的不确定性因素。
Production planning usually takes place only on one level of your product structure.
生产计划通常发生在你的产品结构中其中一层。
Simulation Research on Optimization Balance Model of Aggregate Production Planning;
竞争性平衡的动态模型;
Arrange the start up and stop of the production according to the production planning.
根据生产计划安排生产的启动和停止。
Work closely with order processing and stamping area to organize production planning.
与订单处理和冲压区域主管紧密合作以组织后处理区域生产计划。
Responsible for overall planning and coordination, and production planning to achieve.
负责生产整体规划与协调及生产计划达成。
The technique and application of a multi plant production planning model are introduced.
介绍炼油化工生产经营计划多厂模型技术及应用。
This paper is about process control problem of production planning and material inventory.
利用支撑的概念,研究生产计划-库存控制过程。
However, how to balance the production planning in efficient would be a subject to discuss.
但是,如果与生产安排协调并使其有效则需要另一话题来讨论了。
Lot sizing and scheduling are the two major aspects of production planning and control (PPC).
分批与调度是生产计划与控制(PPC)的两个主要方面。
This can be used for the production planning to serial equipment and accelerating production.
对于探讨适应系列化装备的生产模式、加快产品试制速度,具有较大的理论指导作用。
Assist superior on production planning according to working instruction and production capacity.
根据工作指令和生产量协助上级安排生产计划。
For example, these deficits can be balanced by a knowledge-based production planning and control.
例如,这些缺陷可以通过基于知识的生产计划与控制得以平衡。
Therefore, it's significant to research the structure of BOM and make Production Planning accordingly.
因此,研究BOM的结构设计和制定基于BOM的生产计划有着十分重要的意义。
Checking the daily shift production planning, effective communication support to other function department.
检查每班,日生产计划,以及对应部门的有效沟通。
Prepare and implement production operation procedures; Make production planning, handle daily production task.
准备和执行生产运作程序;制定生产计划、处理日常生产任务;
This paper mainly discusses collaborative production planning mode and method on collaborative production management.
本文主要研究协同生产管理的协同生产计划模式与方法。
This paper mainly discusses collaborative production planning mode and method on collaborative production management.
本文主要研究协同生产管理的协同生产计划模式与方法。
应用推荐