Project evaluation is the basis of investment decision.
项目评估是投资决策的依据。
This is a thesis about the method of project evaluation.
本文是一篇探讨项目评价的文章。
Chapter 3: Project evaluation system of venture capital.
第三章:创业投资的评估体系。
Social impact evaluation is an indispensability part of project evaluation.
社会影响评价是项目评价一个不可缺少的部分。
To submit the Supervision Evaluation Report for the project to the Client .
向委托人提交项目监理评估总结报告;
Study the project objectives as well as the evaluation guide in the manual.
研究项目的目标以及手册中的评价指南。
Performance evaluation method of project expenditure is an important part of budget management.
项目支出绩效评价方法工作是预算管理的重要环节。
Economic evaluation in environmental impact on construction project or technology upgrading project remains difficult.
建设项目或技术改造项目的环境影响经济评价至今仍是项目评估中的难点之一。
The essential of project risk evaluation is pattern classification.
项目风险评价其实质是模式分类问题。
Project post evaluation is an important part in irrigation and drainage project management.
大型排灌工程项目后评价是大型排灌工程项目科学管理的重要环节。
Quality acceptance and evaluation of project.
工程项目竣工验收及项目的后评价。
Right analyze the cash discharge is the premise of the real estate project finance evaluation.
正确分析现金流量是房地产项目财务评价的前提。
Therefore, the power transmission project after the evaluation has a very real necessity.
因此,对输变电工程进行后评价有着十分现实的必要性。
Socioeconomic benefit evaluation is the main precondition and foundation in railway project planning and decision.
社会经济效益评价是铁路干线路网规划及建设项目决策的重要前提和依据。
Article 6 the state practises the construction project environmental impact evaluation system.
第六条国家实行建设项目环境影响评价制度。
Fifth, the evaluation of the new project.
第五部分,设计方案的评价分析。
The last Lab provides some guidance to the evaluation of project size and complexity.
最后一个实验课提供一些对估计专题的工作量和复杂度的指导。
The fifth part is the content of evaluation project.
第五部分是绩效考核方案的内容。
The evaluation of a construction project of oil and gas often involves various indices.
对油气产能建设性项目进行经济评价时,往往涉及到多个经济评价指标。
What is your overall evaluation for this project?
你对该项目的整体评价是什么?
What is your overall evaluation for the project?
你对该项目的整体评价是什么?
However, these contents are very important to soft science project post-evaluation.
然而,这些后评价内容对于软科学项目是十分重要的。
The index system of later-evaluation is an important part of water conservancy project of later-evaluation.
水利项目后评价的一项重要内容是对其后评价指标体系的建立。
The index system of later-evaluation is an important part of water conservancy project of later-evaluation.
水利项目后评价的一项重要内容是对其后评价指标体系的建立。
应用推荐