Responsible for project cost and schedule control.
负责项目成本和进度控制。
Schedule control-controlling changes to the project schedule.
进度控制——控制项目进度的变更。
In the schedule control, the main tools are Gantt chart and check list.
在进度控制方面,使用的主要工具是甘特图和核查清单。
Project development plan, and the project execution schedule control and management.
制定项目开发计划,并对项目执行进度进行控制、管理。
The quality control, cost control, schedule control, and safety control are the "four control"in the project construction management.
质量控制、成本控制、进度控制、安全控制是项目施工管理中的“四大控制”。
With some patience and communication, it is possible to control and structure a hectic schedule.
有了耐心和沟通,控制并建构一个紧张有序的时间表是有可能的。
At the same time we can control our schedule, we can control when we go to bed and when we wake up.
但是,我们能控制我们的时间表,我们能决定我们什么时候睡觉,什么时候起床。
掌控你的工作日程表。
You need some sort of regular schedule in order to get things under control.
你需要一些有规律的安排来实现你对这些的控制。
Prepare project management for some project, control project schedule, control project cost and down project risk.
参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;
Plan, schedule and monitor pest control through approved contractors.
与已确定的承包商计划并监督对虫害的控制。
In other words, it includes the management and control of schedule, cost, quality and data.
从内容和目标上讲包括上述全过程的进度、费用、质量和数据的管理与控制。
The production schedule and control of the extended enterprise are different from the traditional enterprise.
网络联盟企业的生产计划与控制同传统企业相比具有其独特的性质。
The cost, schedule and quality are the most important aim of control in the construction project.
工程建设项目的成本、进度与质量一起并称为建设项目管理的三大控制目标。
Process MFG purchase order for all goods and control the shipping schedule.
处理MFG采购订单及追踪控制订单交期。
Check installation quality, control installation schedule;
检查安装质量,控制安装进度;
The major control elements for a project management should be its quality, schedule and costs.
项目管理的主要控制要素是质量、进度和成本。
Very grateful to be in his busy schedule to read my computerize its control!
非常感谢能在百忙之中阅读我的来件!
To control the project schedule and ensure the quality.
确保项目进度及质量。
Effectively control the delivery scope, cost, schedule and quality.
对供货范围、成本、进度、质量等进行有效控制。
Implementation schedule and control plan.
实施进度管制计画。
C. Procurement Documentation, Contract Change Control System, Payment Schedule, Contract Management Plan.
采购文档,合同变更控制系统,支付进度表,合同管理计划。
Also, this paper details the complex and high-speed logic control and timing schedule design.
对于系统中复杂且高速的逻辑控制及时序设计及其实现的阐述是论文的另一重要部分。
Maintain the Job-boss. Control the master schedule of production.
保持工作的老板。控制总表生产。
Maintain the Job-boss. Control the master schedule of production.
保持工作的老板。控制总表生产。
应用推荐