The project schedule is practical.
项目时间表是可行的。
Integration of the WBS in the Project schedule.
在项目日程中整合wbs。
To control the project schedule and ensure the quality.
确保项目进度及质量。
We shall also make the project schedule report everyday.
我们也将每天提出项目进度报告。
We shall also make the project schedule report every day.
我们也将每天提出项目进度报告。
Schedule control-controlling changes to the project schedule.
进度控制——控制项目进度的变更。
Use the project schedule to justify pursuing one of these options.
在协商的过程中,你需要基于项目时间表,在多种选择中作出决断。
The project schedule has been compressed, and the CPI is 1.1.
项目的进度已经进行了紧缩,当前的CPI为1.1。
This is unpaid and not reflected in the project schedule to our client.
这是否付费在给我们客户的项目计划中已反映出来了。
The project schedule management plays a key role in the success of a project.
项目进度管理对项目的成功与否起着关键的作用。
The project schedule, Each resource planning, The new technology application;
施工进度计划;各项资源计划;新技术应用;
This is the process necessary for controlling changes to the project schedule.
这是控制项目进度变更需要的过程。
They collected and logged in the most expedient method for the project schedule.
他们以最便利的方法为项目进度收集数据并记录。
The project schedule can reflect this, and the utilization rate will be higher.
项目计划能反映这一点,这样人员利用率将较高一些。
Before the construction site, understand all process in the project schedule for will save your time and money.
在建网站以前,理解全部过程会在项目进度中为您节约时间和金钱。
We have to allow for the possibility that we might not finish this project on schedule.
我们必须考虑到我们可能不能按时完成这个项目的情况。
The tunnel project has already fallen behind schedule.
隧道工程已经晚了工期。
The first phase of the project was completed two months ahead of schedule.
第一期工程提前两个月完工。
We got the project done on schedule.
我们按期完成了这个项目。
Since then, however, analysts have noted that the ARJ21 project has been running behind schedule.
但分析师指出,此后,ARJ21项目的进展落后于计划。
Drafting a work breakdown structure (WBS) as the basis for a project schedule.
草拟以项目计划为基础的工作故障结构(WBS)。
If it is less than one, the project is behind schedule.
如果SPI小于一表示项目落后于计划。
The project team would continue in this manner until they were back on schedule.
项目团队将以这种方式继续下去,直到他们回到进度上来。
If the SPI is greater than one, the project is ahead of schedule.
如果SPI大于一,项目是比计划超前的。
The project team normally consists of project engineer, design engineer, schedule engineer, and various specialists.
项目工作组通常包括有项目工程师、设计工程师、计划工程师、以及各类专家。
She said with confidence that you could never complete the project on schedule.
你不可能按时完成这个计划,她信心十足地说。
They have completed that project two days ahead of the schedule.
他们比预期的时间提前两天完成了计划。
They have completed that project two days ahead of the schedule.
他们比预期的时间提前两天完成了计划。
应用推荐