• The project schedule is practical.

    项目时间表可行的。

    youdao

  • Integration of the WBS in the Project schedule.

    项目日程整合wbs

    youdao

  • To control the project schedule and ensure the quality.

    确保项目进度质量

    youdao

  • We shall also make the project schedule report everyday.

    我们每天提出项目进度报告

    youdao

  • We shall also make the project schedule report every day.

    我们每天提出项目进度报告

    youdao

  • Schedule control-controlling changes to the project schedule.

    进度控制——控制项目进度变更

    youdao

  • Use the project schedule to justify pursuing one of these options.

    在协商过程,你需要基于项目时间表,在多种选择中作出决断

    youdao

  • The project schedule has been compressed, and the CPI is 1.1.

    项目进度已经进行了紧缩当前的CPI为1.1。

    youdao

  • This is unpaid and not reflected in the project schedule to our client.

    是否付费我们客户项目计划已反映出来了

    youdao

  • The project schedule management plays a key role in the success of a project.

    项目进度管理对项目成功与否关键作用

    youdao

  • The project schedule, Each resource planning, The new technology application;

    施工进度计划各项资源计划技术应用;

    youdao

  • This is the process necessary for controlling changes to the project schedule.

    控制项目进度变更需要过程

    youdao

  • They collected and logged in the most expedient method for the project schedule.

    他们便利方法项目进度收集数据记录

    youdao

  • The project schedule can reflect this, and the utilization rate will be higher.

    项目计划反映一点,这样人员利用率较高一些。

    youdao

  • Before the construction site, understand all process in the project schedule for will save your time and money.

    在建网站以前理解全部过程项目进度中节约时间金钱

    youdao

  • We have to allow for the possibility that we might not finish this project on schedule.

    我们必须考虑我们可能不能按时完成这个项目情况。

    youdao

  • The tunnel project has already fallen behind schedule.

    隧道工程已经晚了工期。

    《牛津词典》

  • The first phase of the project was completed two months ahead of schedule.

    第一工程提前个月完工

    《新英汉大辞典》

  • We got the project done on schedule.

    我们按期完成这个项目

    youdao

  • Since then, however, analysts have noted that the ARJ21 project has been running behind schedule.

    分析师指出此后ARJ21项目的进展落后于计划

    youdao

  • Drafting a work breakdown structure (WBS) as the basis for a project schedule.

    草拟项目计划为基础工作故障结构(WBS)。

    youdao

  • If it is less than one, the project is behind schedule.

    如果SPI小于表示项目落后计划

    youdao

  • The project team would continue in this manner until they were back on schedule.

    项目团队这种方式继续下去直到他们回到进度上来。

    youdao

  • If the SPI is greater than one, the project is ahead of schedule.

    如果SPI大于项目计划超前

    youdao

  • The project team normally consists of project engineer, design engineer, schedule engineer, and various specialists.

    项目工作组通常包括有项目工程师设计工程师、计划工程师、以及各类专家

    youdao

  • She said with confidence that you could never complete the project on schedule.

    可能按时完成这个计划,信心十足

    youdao

  • They have completed that project two days ahead of the schedule.

    他们比预期时间提前完成计划

    youdao

  • They have completed that project two days ahead of the schedule.

    他们比预期时间提前完成计划

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定