• Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.

    重点分析了运用赢得评估原理实现工程项目进度控制方法

    youdao

  • The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.

    WAPI项目进度控制基于关键管理的进度控制,核心缓冲管理控制

    youdao

  • Present international conventional "earned value evaluation principle" as well as how to combine the earned value with project schedule control and cost control organically were also expounded.

    阐述当前国际通用赢得评估原理以及如何赢得值项目进度控制费用控制有机地联系起来

    youdao

  • After the basics of managing the schedule, managing scope is the most important activity required to control a project.

    做完计划管理基础工作后,范围管理成为控制项目最为重要活动

    youdao

  • Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.

    质量活动必须使成本进度处于项目控制之下,满足CMM精神

    youdao

  • Responsible for project cost and schedule control.

    负责项目成本进度控制

    youdao

  • Prepare project management for some project, control project schedule, control project cost and down project risk.

    参与部分项目项目管理工作,把项目进度控制项目成本降低项目风险

    youdao

  • Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.

    同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解等。

    youdao

  • Schedule control-controlling changes to the project schedule.

    进度控制——控制项目进度变更

    youdao

  • It is crucial for successful project management and schedule control to have a scientific and efficient project execution plan.

    制定套科学高效项目实施计划并按计划进行进度控制成功实施项目管理,使工程按期投产的主要因素。

    youdao

  • On the basis of that, the aviation model development project management schedule control framework was proposed.

    基础上提出航空型号研制项目管理进度控制模型

    youdao

  • The paper puts forward some ideas on project management and design schedule control in modern office environment.

    文中现代办公环境下项目管理设计进度控制工作提出一些想法,供商榷。

    youdao

  • However, owing to the outdated project management system and nonstandard architectural market, there exist some problems such as schedule control, operation management and bidding, etc.

    由于当时水利工程管理体制落后建筑市场不规范,在进度控制运行管理、招投标等方面存在一些问题

    youdao

  • Construction of the project implementation, to develop specific programs and projects in the implementation process on the installation schedule and make adjustments to control.

    项目实施制定具体施工方案项目执行过程中安装进度计划进行调整、控制。

    youdao

  • The quality control, cost control, schedule control, and safety control are the "four control"in the project construction management.

    质量控制成本控制、进度控制、安全控制项目施工管理中的四大控制”。

    youdao

  • Construction of the project implementation, to develop specific programs and project implementation process on the installation schedule and make adjustments to control.

    项目实施制定具体施工方案项目执行过程中安装进度计划进行调整、控制。

    youdao

  • The installation quality of the air-cooling island, which is a turn-key project of Shenmu Yangguang Power Plant, is very important, and its schedule control is also very complicated.

    陕西神木阳光电厂工程安装质量控制主要保证焊缝施工质量风机找平对中的质量,进度控制就是确保施工节点不变。

    youdao

  • Project development plan, and the project execution schedule control and management.

    制定项目开发计划项目执行进度进行控制管理

    youdao

  • Plan and schedule control, cost control, quality control and safety control are important parts of project management.

    计划进度控制成本控制、质量控制安全控制工程项目管理重要组成部分

    youdao

  • Then it also discusses the general process of schedule control, which including three steps, action preparing, process monitoring and controlling, project results evaluation.

    然后讨论项目进度控制一般过程包括准备行动程序、过程监测控制以及最后项目评估三个阶段并对进行分析。

    youdao

  • Site schedule control is an important link of whole project control, and platform fabrication is a critical activity of Pinghu oil and gas field development project.

    报告。平湖油气田工程现场进度控制整个项目控制过程中的重要环节平台建造是整个平湖油气田项目的关键活动之一。

    youdao

  • By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.

    海洋石油工程项目进度控制管理阐述设计阶段网络计划编制、设计过程进度控制方法手段

    youdao

  • Based on the characteristics of Aviation products, this paper mainly focus on the research of schedule control technology in the process of project running.

    本文针对航空产品特点项目运行过程进度控制技术进行研究

    youdao

  • The intention of the project management is to schedule, organize and control all activities to achieve the project goal eventually. No matter how difficult it is and what kind risks are there.

    项目管理目的计划组织控制所有活动达到困难重重极具风险情况下仍能成功而顺利地完成一个项目目标

    youdao

  • Via a lot of work on the large datum, this paper studies schedule and cost's control index values of engineering project by way of different functions and structure types in Xi 'an.

    经过大量数据分析整理,研究西安市范围内几不同使用功能结构形式建设项目工期成本控制指标值

    youdao

  • By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.

    通过分析专业实际进度专业计划进度差距结合实际找到适合项目特点进度控制方法

    youdao

  • The Xiaolangdi water control project is constructed in smooth progress with its major items all along keeping in advance of the contractual schedule.

    小浪底水利枢纽大坝工程施工进度进展顺利各主要项目一直超前合同目标计划。

    youdao

  • The Xiaolangdi water control project is constructed in smooth progress with its major items all along keeping in advance of the contractual schedule.

    小浪底水利枢纽大坝工程施工进度进展顺利各主要项目一直超前合同目标计划。

    youdao