The construction of the roller compacted concrete dam needs four dry seasons and four flood seasons to reach the design elevation.
碾压混凝土拦河坝工程须经过四个枯水期四个汛期的施工才能达到设计高程。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
To increase the shear strength on lift joints of the high roller compacted concrete dam (RCCD), a kind of construction method is brought forward.
理论分析认为这一施工技术对提高碾压混凝土层缝的抗剪强度效果显著。
Study on the propagation of cracks in multi-cracked body leads to a good method for studying the actual simulated gradual destroy process of roller compacted concrete dam.
多裂纹体的裂缝扩展研究为重力式碾压混凝土坝仿真破坏过程研究提供了条件。
A new method for anti - seepage coating of roller compacted concrete dam by using wet - mix shotcreting polyacrylate emulsion cement mortar(PAE mortar) is presented in this paper.
针对碾压砼坝上游面的防渗,提出了湿法喷涂丙乳砂浆集中防渗的新方案。
Based on the actual needs of the situation to study the thermal stress factor for a foundation during long intermittence of roller compacted concrete dam is the great scientific value.
基于实际情况的需要,研究碾压混凝土坝基础长间歇垫层的温度应力影响因素,对于温控防裂具有重要实用价值。
That both the structure and material of concrete dams and construction means of earth dams are used in roller compacted concrete dams make RCC dam increasingly used in water engineerings.
碾压混凝土将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
The surface between roller compacted layers of concrete dam is a weak link of dam.
碾压混凝土坝碾压层之间的层面是坝体的薄弱环节。
Experimental thermal parameters of concrete material considering the temperature conditions during construction were used in the design of Xibing Roller Compacted Thin Arch Dam.
溪柄碾压混凝土薄拱坝设计采用了仿真的材料热学参数。这些参数是在预测的施工温度条件下进行的材料实验中测定的。
Based on the analysis of the seepage reasons of the roller compacted concrete, a design idea against seepage of the RCC dam is developed in this article, in which anti seepage is the stress.
在碾压混凝土渗透成因分析的基础上,本文提出以防为主,防排结合的碾压混凝土坝体渗控设计概念。
Roller compacted concrete (RCC) will be used in section no. 6-no. 15 of the spillway dam, section no. 5 of the non - overflow dam near the left side bank and the left guide wall of Wan 'an Project.
万安水电站二期主体工程溢流坝6 ~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。
Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.
通过比选最终确定为三心圆单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土的快速施工。
Coupled seepage and temperature fields in Longtan roller compacted concrete gravity dam are analyzed by applying the mathematical model for coupled seepage and temperature fields in concrete dam.
应用混凝土坝渗流场与温度场耦合分析的数字模型,进行了龙滩碾压混凝土重力坝稳定渗流场与稳定温度场的耦合分析。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The dam in Guangzhao hydropower station is the highest roller compacted concrete gravity dam in China at present.
光照水电站大坝为目前国内在建的最高的碾压混凝土重力坝。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
应用推荐