• Realistically, a budget accounting item for contingency allowance should be established whenever a contingency amount was included in the final cost estimate.

    在实际操作当中无论详细的成本估算是否包括意外事件,项目预算列支应急储备金。

    youdao

  • The first pass at the product-definition phase should allow you to establish a good rough estimate for an interface's cost, complexity, and design time.

    产品定义阶段第一关口应该建立对接口价格复杂性设计时间粗略估计

    youdao

  • During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.

    初步设计施工图设计阶段分别编制初步设计概算书施工图设计预算书,进一步优化成本预算。

    youdao

  • During the period of preliminary design and construction drawing design, the budget statement should be prepared respectively so as to optimize the cost estimate.

    初步设计施工图设计阶段分别编制初步设计概算书施工图设计预算书,进一步优化成本预算。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定