• We put the two main engineering machine loading which are sinusoidal wave load and step load, and the results indicate that the dynamic responds are satisfied for the needs of the experiments.

    加载工程机械主要两种加载模式正弦波载荷阶跃载荷,试验台动态仿真的结果表明系统动态响应性能能够满足试验要求

    youdao

  • We put the two main engineering machine loading which are sinusoidal wave load and step load, and the results indicate that the dynamic responds are satisfied for the needs of the experiments.

    加载工程机械主要两种加载模式正弦波载荷阶跃载荷,试验台动态仿真的结果表明系统动态响应性能能够满足试验要求

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定