• During the Spiral welded pipe production, the main reasons of manual bend caused in strip steel are unusual aline of strip steel in strip steel connection weld process.

    螺旋生产过程产生人为硬主要原因是对头工序中钢带不能对齐所致

    youdao

  • The results of batch manufacture grade X80 spiral and longitudinal submerged arc welded pipe all meet the pipe technical conations required by"Grade X80 Pipeline Steel Pipe Application Project";

    X80螺旋直缝埋弧焊批量试制结果全部符合“X80级管线钢管应用工程”钢管技术条件的要求

    youdao

  • The results of batch manufacture grade X80 spiral and longitudinal submerged arc welded pipe all meet the pipe technical conations required by"Grade X80 Pipeline Steel Pipe Application Project";

    X80螺旋直缝埋弧焊批量试制结果全部符合“X80级管线钢管应用工程”钢管技术条件的要求

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定