她在最后的冲刺中取得胜利。
Rob Harmeling won the sprint in Bordeaux.
罗布•哈梅林赢得了波尔多短跑赛。
Gilles Delion, of France, won the Tour of Lombardy in a sprint finish at Monza yesterday.
法国选手吉勒斯·德利翁昨天在蒙扎最后冲刺时赢得了伦巴第巡回赛冠军。
Sprint Nextel has reconceived its Virgin Mobile brand to cater to heavy texters in a difficult economy.
SprintNextel 重新设计了其VirginMobile品牌,以迎合经济困难时期重度依赖短信的用户的需求。
Shelly Ann, who at that time only ranked number 70 in the world, beat Jamaica's unchallenged queen of the sprint.
当时世界排名只有70位的雪莉·安击败了牙买加无敌的短跑女王。
As they must also sprint over short distances, speed is essential.
由于他们还必须疾速短跑,因此速度是至关重要的。
Running up to an acid semitonal acciaccatura in both hands, the piano goes over into a sprint of octave-chords and single notes.
钢琴的两只手以半音阶短倚音向上,转变成八度和弦和单音符。
It's a Marathon, Not a Sprint.
营销是一场马拉松,不是短跑。
为Sprint2创建一个计划。
She began to sprint on the last two laps.
她在最后两圈时开始冲刺了。
Create a Sprint Backlog iteration plan.
创建一个Sprintbacklog迭代方案。
Stop, breathe for a SEC, then sprint again.
停下来,呼吸几秒,然后再冲刺。
The aim is to cut Sprint out of the loop.
这么做的目的就是要绕过斯普林特公司。
The athlete put on a sprint of speed to make it.
运动员在到达终点前进行冲刺。
This list of tasks becomes the Sprint Backlog.
任务的列表就成了所谓的代办冲刺。
First, create a Sprint Backlog iteration plan.
首先,创建一个Sprintbacklog迭代方案。
One option is to drag it to the new sprint.
一个选项就是将其拖拉到新的迭代上。
Continually update the Sprint Burndown report.
不断更新sprintBurndown报告。
The sprint typically ended the following week.
sprint通常在DCUT之后的一周结束。
"This is a marathon, not a sprint," says Moore.
摩尔说:“这是一场马拉松比赛,不是百米冲刺。”
I sprint as fast as I can, but not fast enough.
我拼命快跑,但怎么都不够快。
Try it: go outside and sprint all-out for two minutes.
试试吧,走到外面,竭尽全力地冲刺两分钟。
The product owner and team agree on a goal for the sprint.
产品所有者和团队会就冲刺阶段的目标达成一致意见。
The sprint backlog does not change during the sprint.
在sprint期间sprint积压并没有改变。
Effectively assigning resources on-demand for each sprint.
有效的按需为每个sprint分配资源。
You don't know if this is going to be a sprint or a marathon.
你不清楚这到底会成为一场百米冲刺还是马拉松。
The most important part of sprint-based working is the break.
冲刺工作最重要的部分是休息。
In a sprint race, acceleration off the block is everything.
短跑比赛中,从起跑器上加速至关重要。
Delay detailed specifications until the sprint of implementation.
延缓具体的规格,直到实施冲刺为止。
And some nimble small ones will sprint past slower incumbents.
一些灵活的小公司也将快步超越那些步伐缓慢竞争者。
应用推荐