• Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.

    在上述研究基础,制定了具体风险应对工程措施非工程措施,有效控制DS水闸枢纽工程进度风险。

    youdao

  • Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.

    在上述研究基础,制定了具体风险应对工程措施非工程措施,有效控制DS水闸枢纽工程进度风险。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定