Network planning schedule optimization is one of the pivotal issues in engineering project management.
网络计划进度优化是工程项目管理的关键性问题之一。
The optimization adjustment strategy of project schedule.
项目进度优化调整策略。
The time value of capital in schedule cost optimization and the influence of the income of running period to schedule cost optimization of engineering project is mainly studied in this paper.
本文重点研究了工程项目建设期进度费用优化中资金的时间价值以及工程项目运营收益对项目建设期进度费用优化的影响。
In the premise of the high quality of engineering project, the optimization between the project cost and construction schedule determines the successful of a project management.
在保证工程项目质量的前提下,项目成本与进度的优化就成了项目管理成功与否的决定因素。
The optimization schedule models and simulation of CPL are created, and the simulation system is developed, which is run by a CPL in Chongqing as the project background.
建立了优化调度模型和优化调度仿真模型,研制了仿真系统,并以重庆某卷烟厂生产线为工程背景进行了仿真。
The optimization schedule models and simulation of CPL are created, and the simulation system is developed, which is run by a CPL in Chongqing as the project background.
建立了优化调度模型和优化调度仿真模型,研制了仿真系统,并以重庆某卷烟厂生产线为工程背景进行了仿真。