• The second stage foundation pit of the TGP will be bounded by the upstream and downstream transverse cofferdams and the longitudinal concrete cofferdam.

    三峡工程上下游横向围堰混凝土纵向围堰共同形成基坑,保证二期工程施工。

    youdao

  • It has proved by the experiment that the non - removal mesh form can replace the manual roughing on concrete surface in the first and second stage concrete construction.

    试验证明模板混凝土可以代替人工毛工艺。

    youdao

  • The second part: concrete analysis on education contradictions of supply and demand on this stage of our country.

    第二部分现阶段我国教育供求矛盾具体表现。

    youdao

  • For the lining of the main body (2) of the dust chamber (1) and first and second stage cyclones (3, 4) are used the non-porous and wear proof material, for example concrete.

    集尘(1)主体(2)以及第一二级旋风器(3,4)内衬使用耐磨材料例如混凝土。

    youdao

  • For the lining of the main body (2) of the dust chamber (1) and first and second stage cyclones (3, 4) are used the non-porous and wear proof material, for example concrete.

    集尘(1)主体(2)以及第一二级旋风器(3,4)内衬使用耐磨材料例如混凝土。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定