One of the important steps concerning data interpretation of impulse oxygen activation water-flow logging was to accurately locate the peak position in the time spectrum.
脉冲氧活化水流速度测井解释的关键是准确求解时间谱上水流信号的峰位。
This paper studies a new method that determines fluid transit time by automatically tracking the peak value of the software correlation device used for measuring two-phase flow.
本文探讨一种以单片机为核心的两相流测量用软件相关仪中自动跟踪峰值,以确定流体渡越时间的新方法。
The peak value of infiltration flow and pipe flow does not appear at the same time.
结果表明:管流的出现较渗流出现时间迟 ,但其结束的时间较渗流早。
The peak value of infiltration flow and pipe flow does not appear at the same time.
结果表明:管流的出现较渗流出现时间迟 ,但其结束的时间较渗流早。
应用推荐