The restriction of transient voltage dip is a constraint on post fault power system.
暂态电压跌落限制可以考虑为对故障后电力系统的一个约束。
A direct method considering transient voltage dip is proposed to calculate the critical clearing time (CCT) ensuring that voltages of post fault power system are higher than limit.
提出了一种考虑暂态电压跌落限制的直接法,快速求取保证故障后电力系统电压高于限值的故障临界清除时间(CCT)。
A direct method considering transient voltage dip is proposed to calculate the critical clearing time (CCT) ensuring that voltages of post fault power system are higher than limit.
提出了一种考虑暂态电压跌落限制的直接法,快速求取保证故障后电力系统电压高于限值的故障临界清除时间(CCT)。
应用推荐