-
After being awarded the contract, a decided to purchase 3 site concrete pumps and the tunnel placing Boom from the b.
在得到合同后,决定从B那里购买3台现浇混凝土泵和隧道布料机。
youdao
-
After being awarded the contract, a decided to purchase 3 site concrete pumps and the tunnel placing Boom from the b.
在得到合同后,决定从B那里购买3台现浇混凝土泵和隧道布料机。
youdao