• RUP acknowledges four levels of testing: unit testing, integration testing, system testing, and acceptance testing.

    RUP确定了四级测试单元测试、集成测试、系统测试验收测试。

    youdao

  • Therefore, the mapping described here only addresses system testing, and not unit, integration, or acceptance tests.

    因此这里所描述映射会在系统测试上,水在单元测试集成测试验收测试上。

    youdao

  • For the use of fire alarm system, fire detector alarm unit testing and installation of construction engineering units during the installation and acceptance of the tools is necessary.

    使用火灾报警系统单位测试火灾探测器报警功能安装施工工程单位安装验收过程中必备之工具

    youdao

  • For the use of fire alarm system, fire detector alarm unit testing and installation of construction engineering units during the installation and acceptance of the tools is necessary.

    使用火灾报警系统单位测试火灾探测器报警功能安装施工工程单位安装验收过程中必备之工具

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定