Control supply line water pressure. install a soft seated spring loaded check valve upstream of the assembly.
控制供应管道的水压。在总成的上游安装一个软阀座,弹簧负载止回阀。
Revetments protect the space from dam crest to the line a certain distance, normally 2.5m, under the minimum water level of the dam upstream.
护坡覆盖的范围,上游由坝顶护至水库最低水位以下一定距离,一般在最低水位以下2.5米。
Revetments protect the space from dam crest to the line a certain distance, normally 2.5m, under the minimum water level of the dam upstream.
护坡覆盖的范围,上游由坝顶护至水库最低水位以下一定距离,一般在最低水位以下2.5米。
应用推荐