• The seepage field and stability of concrete-faced rockfill dam in Banduo Hydropower Project, when vertical joint inactivation are occurred to the face plate, are calculated by FEM method.

    班多面板堆石坝为例,用有限元方法计算了当面板局部失效各种工况下渗流场,系统分析了大坝面板垂直缝局部失效后的稳定渗流的规律特点。

    youdao

  • The seepage field and stability of concrete-faced rockfill dam in Banduo Hydropower Project, when vertical joint inactivation are occurred to the face plate, are calculated by FEM method.

    班多面板堆石坝为例,用有限元方法计算了当面板局部失效各种工况下渗流场,系统分析了大坝面板垂直缝局部失效后的稳定渗流的规律特点。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定