The two-unit cold standby system and the two-unit warm standby system are discussed.
本文讨论两元件冷储备系统和热储备系统。
The classic example is a disaster recovery test, which involves failing over to a warm standby system, testing the applications, and then failing back to the primary systems.
典型示例是灾难恢复测试,其中涉及故障转移到热备用系统、测试应用程序,然后退回到主系统。
The classic example is a disaster recovery test, which involves failing over to a warm standby system, testing the applications, and then failing back to the primary systems.
典型示例是灾难恢复测试,其中涉及故障转移到热备用系统、测试应用程序,然后退回到主系统。
应用推荐