One septic tank is foreseen for offices sewage network connecting to waste water pump station.
办公室污水通过一个化粪池连接至污水泵站。
The technology process and the control demands of a waste water pump are presented, and the design of hardware and software based on PLC for the pump station automatic control are described.
介绍了一个污水泵站的控制工艺和控制要求,阐述了泵站自动控制系统中plc的硬件、软件设计。
The technology process and the control demands of a waste water pump are presented, and the design of hardware and software based on PLC for the pump station automatic control are described.
介绍了一个污水泵站的控制工艺和控制要求,阐述了泵站自动控制系统中plc的硬件、软件设计。
应用推荐